How a Basildon bathroom refit runs
One team from strip-out to silicone. Week one is strip-out, first fix plumbing and electrics, tanking, boarding and screeding; week two is tiling, second fix, brassware, decorating and snagging. Most Basildon bathrooms are back in use in nine to fourteen working days, on a written programme agreed before we lift a floorboard.
Waterproofing is where bathrooms are won or lost
Shower zones are tanked with a liquid membrane over primed, screw-fixed boards, internal corners get matting tape, and pipe penetrations are collared. It is the invisible half-day that stops a beautiful bathroom rotting a joist three years later.
Falls, drainage and level access
Level-access showers in SS14 homes need the joists checked and the fall formed properly — either a pre-formed tray former or a hand-built screed to a linear drain. We survey the floor structure first and tell you honestly whether level access is realistic in your room.
Plumbing and electrics done to certificate
Concealed valves are fitted on serviceable plates, hot and cold are balanced, and pressure is measured at survey rather than assumed. Extractor fans, shaver points, underfloor heating and lighting are certified to Part P, with zone-correct fittings throughout.
Working in Basildon
Basildon is about fifty minutes south-east of our Essex base, so SS14 bathrooms run as one continuous block of days with the same fitters throughout. A lot of Basildon rooms are compact, so millimetres matter — everything is set out from a measured survey, not a showroom drawing.