One team, start to finish
The same people strip out, plumb, tank, tile, wire and finish your Brentwood bathroom. No waiting three days for a tiler who never confirmed, and no gaps where the room sits half-built while trades blame each other.
CM13 to CM15 houses and what they need
Brentwood is largely interwar and post-war detached and semi-detached housing on generous plots, with substantial period property around Shenfield and Hutton. A lot of CM13 to CM15 stock has already been extended once, which means mixed floor levels and build-ups that have to be levelled before anything is fixed down. We survey before quoting so the pipework and boarding plan matches the house rather than a standard spec sheet.
Waterproofing done properly
Most failed bathrooms we are called to rescue failed at the waterproofing, not the tiles. Wet walls get cement or foam board, showers get two-coat tanking with taped joints, and wet rooms get full tanking with a linear drain set into a formed fall.
A written programme, not a vague promise
You get the day-by-day plan before we start: protection and strip-out, first fix, boarding and tanking, tiling, second fix, silicone and snagging. Most Brentwood bathrooms finish in eight to twelve working days.
Working across Brentwood
Brentwood is roughly forty minutes from our base, so the job is booked as continuous days rather than odd visits between other work. Older properties around Warley have solid walls and lime plaster, so we use the right boarding and fixings rather than assuming a modern stud wall.