One team, start to finish
The same people strip out, plumb, tank, tile, wire and finish your Cambridge bathroom. No waiting three days for a tiler who never confirmed, and no gaps where the room sits half-built while trades blame each other.
CB1 to CB4 houses and what they need
Cambridge is bay-fronted Victorian terraces around Mill Road, Romsey and Chesterton, 1930s semis in Cherry Hinton, and newer apartments and houses at Trumpington and Eddington. Central terraces have solid walls, suspended timber floors and very tight access, so pipe routes, boarding and waste removal are planned at survey rather than improvised. We survey before quoting so the pipework and boarding plan matches the house rather than a standard spec sheet.
Waterproofing done properly
Most failed bathrooms we are called to rescue failed at the waterproofing, not the tiles. Wet walls get cement or foam board, showers get two-coat tanking with taped joints, and wet rooms get full tanking with a linear drain set into a formed fall.
A written programme, not a vague promise
You get the day-by-day plan before we start: protection and strip-out, first fix, boarding and tanking, tiling, second fix, silicone and snagging. Most Cambridge bathrooms finish in eight to twelve working days.
Working across Cambridge
Cambridge is around twenty-four miles from our base, so the job is booked as continuous days rather than odd visits between other work. Where a room sits over a suspended timber floor we check joists and reinforce before tanking and tiling.