How a Chigwell bathroom refit actually runs
Protection and strip-out on day one, first fix on days two and three, then boarding, tanking, tiling, second fix and snagging. Waste goes in a skip we arrange, not in your driveway for a fortnight. You get a written day-by-day plan at the quote stage so you know who is on site tomorrow and what they are doing, and if it is your only bathroom the WC goes back in early so you are never without one overnight.
Waterproofing that goes in before the tiles, not after the leak
Nearly every failed shower we are called out to in IG7 and IG7 went the same way: a membrane stopped short of the tray lip, or plasterboard given one thin coat of tanking paint. Shower zones here get cement board or slurry with taped internal corners, the membrane dressed over the tray, and the pipework pressure tested before anything is closed in. One extra day, one ceiling saved.
Floors, falls and level access
Timber floors are overboarded and stiffened before a tile goes down, because a floor that flexes cracks grout however good the tiler is. Wet rooms get a recessed former between the joists so the finished floor sits level with the landing, the fall formed in the former rather than bodged up in adhesive, and the drain set so the screen lands on a flat line.
Every trade in-house
Plumbing, tiling, plastering, electrics, carpentry and decorating are all our own people, so nobody waits a week on a tiler who is finishing somebody else's job. Gabriel has been on the tools since 2001 and prices the work himself, which is why the quote and the invoice match.
Booked as one continuous block in Chigwell
We schedule Chigwell bathrooms as a single run of consecutive days with materials delivered up front, so the job runs straight through instead of being stretched around travelling. Same two faces every morning, no travel charge.