One team, start to finish
The same people strip out, plumb, tank, tile, wire and finish your Romford bathroom. No waiting three days for a tiler who never confirmed, and no gaps where the room sits half-built while trades blame each other.
RM1 to RM7 houses and what they need
Romford is dense Edwardian and 1930s terraces and semis across RM1 to RM7, with the Gidea Park garden-suburb stock and post-war estates in between. Gidea Park garden-suburb properties have original details worth keeping, and we work around period joinery and floors instead of ripping everything out by default. We survey before quoting so the pipework and boarding plan matches the house rather than a standard spec sheet.
Waterproofing done properly
Most failed bathrooms we are called to rescue failed at the waterproofing, not the tiles. Wet walls get cement or foam board, showers get two-coat tanking with taped joints, and wet rooms get full tanking with a linear drain set into a formed fall.
A written programme, not a vague promise
You get the day-by-day plan before we start: protection and strip-out, first fix, boarding and tanking, tiling, second fix, silicone and snagging. Most Romford bathrooms finish in eight to twelve working days.
Working across Romford
Romford is around forty-five minutes from Bishop’s Stortford, so the job is booked as continuous days rather than odd visits between other work. Parking is permit-controlled on much of RM1 to RM7, so skip permits and delivery slots are arranged before the first day rather than improvised.