One team, start to finish
The same people strip out, plumb, tank, tile, wire and finish your St Albans bathroom. No waiting three days for a tiler who never confirmed, and no gaps where the room sits half-built while trades blame each other.
AL1 to AL4 houses and what they need
St Albans is Victorian villas around the city centre, large 1930s detached houses and a lot of previously extended stock. Conservation area rules bite in central St Albans, so external changes and window alterations are checked against the consent before work starts. We survey before quoting so the pipework and boarding plan matches the house rather than a standard spec sheet.
Waterproofing done properly
Most failed bathrooms we are called to rescue failed at the waterproofing, not the tiles. Wet walls get cement or foam board, showers get two-coat tanking with taped joints, and wet rooms get full tanking with a linear drain set into a formed fall.
A written programme, not a vague promise
You get the day-by-day plan before we start: protection and strip-out, first fix, boarding and tanking, tiling, second fix, silicone and snagging. Most St Albans bathrooms finish in eight to twelve working days.
Working across St Albans
St Albans is about forty-five minutes west of Bishop’s Stortford, so the job is booked as continuous days rather than odd visits between other work. Many AL1 to AL4 houses have earlier extensions with mixed floor build-ups, which is the single most common reason a tiled or fitted job needs levelling first.