One team, start to finish
The same people strip out, plumb, tank, tile, wire and finish your Stevenage bathroom. No waiting three days for a tiler who never confirmed, and no gaps where the room sits half-built while trades blame each other.
SG1 and SG2 houses and what they need
Stevenage is new-town 1950s and 60s terraces and semis across Shephall, Chells and Pin Green, plus older Old Town stock and modern infill. New-town bathrooms and kitchens are small and often still on original pipe runs, so first fix is a bigger share of the job than in a modern house. We survey before quoting so the pipework and boarding plan matches the house rather than a standard spec sheet.
Waterproofing done properly
Most failed bathrooms we are called to rescue failed at the waterproofing, not the tiles. Wet walls get cement or foam board, showers get two-coat tanking with taped joints, and wet rooms get full tanking with a linear drain set into a formed fall.
A written programme, not a vague promise
You get the day-by-day plan before we start: protection and strip-out, first fix, boarding and tanking, tiling, second fix, silicone and snagging. Most Stevenage bathrooms finish in eight to twelve working days.
Working across Stevenage
Stevenage is about forty minutes from our base, so the job is booked as continuous days rather than odd visits between other work. Old Town properties are period with solid walls and lime plaster, and get breathable materials rather than sealing everything in cement and gypsum.