Structure first, finishes last
Every job we run in Barnet starts with the parts you never see again: foundations dug to the depth the ground actually needs, steels sized by an engineer with padstones and fire protection, and a weathertight roof before a single plasterboard sheet arrives. Finishes are the easy part once the shell is right.
The EN4, EN5 and N20 building stock
Barnet is Victorian and Edwardian terraces in New Barnet, large 1930s semis across East Barnet and Whetstone, and substantial detached property at Totteridge. We survey what is actually there — wall construction, floor build-up, drain runs and roof type — and price from that, so the quote reflects your house instead of a generic square-metre rate.
One team, one programme
You deal with Gabriel from the first site visit to the final snag. Trades are sequenced in writing — groundwork, structure, roof, first fix, plaster, second fix, decoration — so nobody arrives to a job that is not ready and the Barnet programme does not quietly drift by a month.
Building control and paperwork
Building regulations approval, structural calculations, party wall notices where a shared wall is involved and London Borough of Barnet conditions are all handled as part of the job. You get the inspection sign-offs and certificates at the end, which is exactly what a solicitor asks for when you sell.
Building work across Barnet
Barnet is about an hour from our base, so we take on EN4, EN5 and N20 work as whole projects with a settled programme rather than piecemeal days. Small structural jobs run one to two weeks, a single-storey extension eight to twelve, and a full refurbishment two to four months.