Structure first, finishes last
Every job we run in Braintree starts with the parts you never see again: foundations dug to the depth the ground actually needs, steels sized by an engineer with padstones and fire protection, and a weathertight roof before a single plasterboard sheet arrives. Finishes are the easy part once the shell is right.
The CM7 building stock
Braintree is Victorian weaving-era terraces in Bocking, mid-century estates and large modern development at Great Notley. We survey what is actually there — wall construction, floor build-up, drain runs and roof type — and price from that, so the quote reflects your house instead of a generic square-metre rate.
One team, one programme
You deal with Gabriel from the first site visit to the final snag. Trades are sequenced in writing — groundwork, structure, roof, first fix, plaster, second fix, decoration — so nobody arrives to a job that is not ready and the Braintree programme does not quietly drift by a month.
Building control and paperwork
Building regulations approval, structural calculations, party wall notices where a shared wall is involved and Braintree District Council conditions are all handled as part of the job. You get the inspection sign-offs and certificates at the end, which is exactly what a solicitor asks for when you sell.
Building work across Braintree
Braintree is around thirty-five minutes from our base, so CM7 building work is programmed in continuous weeks with materials delivered ahead of each trade. Small structural jobs run one to two weeks, a single-storey extension eight to twelve, and a full refurbishment two to four months.