Structure first, finishes last
Every job we run in Brentwood starts with the parts you will never see again: foundations dug to the depth the ground actually needs, steels sized by an engineer with padstones and fire protection, and a weathertight roof before a single plasterboard sheet arrives. Finishes are the easy part once the shell is right.
The CM13 to CM15 building stock
Brentwood is mostly large interwar and post-war detached houses, Shenfield family homes and a growing number of full refurbishments, and each of those wants a different approach. We survey what is there — wall construction, floor build-up, drain runs, roof type — and price from that, so the quote reflects your house rather than a generic square-metre rate.
One team, one programme
You deal with Gabriel from the first site visit to the final snag. Trades are sequenced in writing — groundwork, structure, roof, first fix, plaster, second fix, decoration — so nobody turns up to a job that is not ready and the Brentwood programme does not drift by a month.
Building control and paperwork
Building regulations approval, structural calculations, party wall notices where a shared wall is involved and Brentwood Borough Council conditions are all handled as part of the job. You get the inspection sign-offs and certificates at the end, which is what a solicitor asks for when you sell.
Building work across Brentwood
Brentwood is about thirty-five minutes south of Bishop's Stortford, so CM13 to CM15 work is booked as continuous days with materials delivered ahead of the trade that needs them. Small structural jobs run one to two weeks, a single-storey extension eight to twelve, and a full refurbishment two to four months.