Structure first, finishes last
Every job we run in Harlow starts with the parts you never see again: foundations dug to the depth the ground actually needs, steels sized by an engineer with padstones and fire protection, and a weathertight roof before a single plasterboard sheet arrives. Finishes are the easy part once the shell is right.
The CM17 to CM20 building stock
Harlow is a new town: Gibberd-era terraces and semis from the 1950s and 60s, timber-framed blocks, plus modern estates at Newhall, Church Langley and Gilden Park. We survey what is actually there — wall construction, floor build-up, drain runs and roof type — and price from that, so the quote reflects your house instead of a generic square-metre rate.
One team, one programme
You deal with Gabriel from the first site visit to the final snag. Trades are sequenced in writing — groundwork, structure, roof, first fix, plaster, second fix, decoration — so nobody arrives to a job that is not ready and the Harlow programme does not quietly drift by a month.
Building control and paperwork
Building regulations approval, structural calculations, party wall notices where a shared wall is involved and Harlow District Council conditions are all handled as part of the job. You get the inspection sign-offs and certificates at the end, which is exactly what a solicitor asks for when you sell.
Building work across Harlow
Harlow is fifteen minutes from our Bishop’s Stortford base, so CM17 to CM20 work is booked as continuous days and we can get back for a snag the same week. Small structural jobs run one to two weeks, a single-storey extension eight to twelve, and a full refurbishment two to four months.