Structure first, finishes last
Every Letchworth Garden City job we run starts with the parts you never see again: foundations dug to the depth the ground actually needs, engineer-sized steels with padstones and fire protection, and a weathertight roof before a single sheet of plasterboard arrives. Finishes are the easy part once the shell is right.
The SG6 building stock
Letchworth is the original garden city, so much of SG6 is early twentieth-century Arts and Crafts housing with roughcast render, steep tiled roofs, casement windows and generous plots, alongside post-war estates at Jackmans and Wilbury. Extension design here is judged on how well it matches the original detailing, not just on the numbers.
One team, one programme
You deal with Gabriel from the first site visit to the final snag. Trades are sequenced in writing — groundwork, structure, roof, first fix, plaster, second fix, decoration — so nobody turns up to a job that is not ready and the Letchworth Garden City programme does not quietly drift by a month.
Building control and paperwork
Building regulations approval, structural calculations, party wall notices where a shared wall is involved and North Hertfordshire Council conditions are all handled as part of the job. You get inspection sign-offs and certificates at the end, which is exactly what a solicitor asks for when you sell.
Building work across Letchworth Garden City
Letchworth Garden City is roughly seventeen miles from our base, so SG6 projects run as continuous programmed weeks with Gabriel on site. Small structural jobs run one to two weeks, a single-storey extension eight to twelve, and a full refurbishment two to four months.