Structure first, finishes last
Every Loughton job we run starts with the parts you never see again: foundations dug to the depth the ground actually needs, engineer-sized steels with padstones and fire protection, and a weathertight roof before a single sheet of plasterboard arrives. Finishes are the easy part once the shell is right.
The IG10 building stock
Loughton runs from large Edwardian and interwar villas on the Forest edge, through 1930s bay-fronted semis around Debden, to the post-war Debden estate. Many IG10 houses have already been extended once, so we survey floor build-ups, existing steels and drain runs before pricing rather than assuming a standard rear return.
One team, one programme
You deal with Gabriel from the first site visit to the final snag. Trades are sequenced in writing — groundwork, structure, roof, first fix, plaster, second fix, decoration — so nobody turns up to a job that is not ready and the Loughton programme does not quietly drift by a month.
Building control and paperwork
Building regulations approval, structural calculations, party wall notices where a shared wall is involved and Epping Forest District Council conditions are all handled as part of the job. You get inspection sign-offs and certificates at the end, which is exactly what a solicitor asks for when you sell.
Building work across Loughton
Loughton is around fourteen miles from our base with a straight run down the M11, so IG10 projects are booked as continuous programmed weeks with Gabriel on site. Small structural jobs run one to two weeks, a single-storey extension eight to twelve, and a full refurbishment two to four months.