Structure first, finishes last
Every Roydon job we run starts with the parts you never see again: foundations dug to the depth the ground actually needs, engineer-sized steels with padstones and fire protection, and a weathertight roof before a single sheet of plasterboard arrives. Finishes are the easy part once the shell is right.
The CM19 building stock
Roydon combines High Street and Epping Road period cottages with post-war and 1980s housing plus riverside and lakeside property. We survey what is actually there — wall construction, floor build-up, drain runs and roof type — and price from that, so the quote reflects your house rather than a generic square-metre rate.
One team, one programme
You deal with Gabriel from the first site visit to the final snag. Trades are sequenced in writing — groundwork, structure, roof, first fix, plaster, second fix, decoration — so nobody turns up to a job that is not ready and the Roydon programme does not quietly drift by a month.
Building control and paperwork
Building regulations approval, structural calculations, party wall notices where a shared wall is involved and Epping Forest District Council conditions are all handled as part of the job. You get inspection sign-offs and certificates at the end, which is exactly what a solicitor asks for when you sell.
Building work across Roydon
Roydon is about eight miles from our base, so CM19 projects run as continuous programmed weeks with Gabriel on site. Small structural jobs run one to two weeks, a single-storey extension eight to twelve, and a full refurbishment two to four months.