Structure first, finishes last
Every Royston job we run starts with the parts you never see again: foundations dug to the depth the ground actually needs, engineer-sized steels with padstones and fire protection, and a weathertight roof before a single sheet of plasterboard arrives. Finishes are the easy part once the shell is right.
The SG8 building stock
Royston mixes Victorian brick terraces around Kneesworth Street and Melbourn Street, chalk-and-flint cottages in the surrounding villages, and large 1970s to 1990s estates on the edges of town. SG8 sits on chalk, which is good bearing ground but wants care with drainage and soakaways, so we trial-hole before committing to foundation depths.
One team, one programme
You deal with Gabriel from the first site visit to the final snag. Trades are sequenced in writing — groundwork, structure, roof, first fix, plaster, second fix, decoration — so nobody turns up to a job that is not ready and the Royston programme does not quietly drift by a month.
Building control and paperwork
Building regulations approval, structural calculations, party wall notices where a shared wall is involved and North Hertfordshire Council conditions are all handled as part of the job. You get inspection sign-offs and certificates at the end, which is exactly what a solicitor asks for when you sell.
Building work across Royston
Royston is about fourteen miles from our base, so SG8 projects run as continuous programmed weeks with Gabriel on site. Small structural jobs run one to two weeks, a single-storey extension eight to twelve, and a full refurbishment two to four months.