Structure first, finishes last
Every job we run in Stevenage starts with the parts you never see again: foundations dug to the depth the ground actually needs, steels sized by an engineer with padstones and fire protection, and a weathertight roof before a single plasterboard sheet arrives. Finishes are the easy part once the shell is right.
The SG1 and SG2 building stock
Stevenage is Britain’s first new town: 1950s and 60s terraces and semis across Shephall, Chells and Pin Green, plus older Old Town stock and modern infill. We survey what is actually there — wall construction, floor build-up, drain runs and roof type — and price from that, so the quote reflects your house instead of a generic square-metre rate.
One team, one programme
You deal with Gabriel from the first site visit to the final snag. Trades are sequenced in writing — groundwork, structure, roof, first fix, plaster, second fix, decoration — so nobody arrives to a job that is not ready and the Stevenage programme does not quietly drift by a month.
Building control and paperwork
Building regulations approval, structural calculations, party wall notices where a shared wall is involved and Stevenage Borough Council conditions are all handled as part of the job. You get the inspection sign-offs and certificates at the end, which is exactly what a solicitor asks for when you sell.
Building work across Stevenage
Stevenage is about forty minutes from our base, so SG1 and SG2 jobs are programmed as full weeks with materials on site ahead of each trade. Small structural jobs run one to two weeks, a single-storey extension eight to twelve, and a full refurbishment two to four months.