Structure first, finishes last
Every job we run in Welwyn Garden City starts with the parts you never see again: foundations dug to the depth the ground actually needs, steels sized by an engineer with padstones and fire protection, and a weathertight roof before a single plasterboard sheet arrives. Finishes are the easy part once the shell is right.
The AL7 and AL8 building stock
Welwyn Garden City is neo-Georgian garden-city housing west of the railway and larger post-war and modern estates east of it in Panshanger and Haldens. We survey what is actually there — wall construction, floor build-up, drain runs and roof type — and price from that, so the quote reflects your house instead of a generic square-metre rate.
One team, one programme
You deal with Gabriel from the first site visit to the final snag. Trades are sequenced in writing — groundwork, structure, roof, first fix, plaster, second fix, decoration — so nobody arrives to a job that is not ready and the Welwyn Garden City programme does not quietly drift by a month.
Building control and paperwork
Building regulations approval, structural calculations, party wall notices where a shared wall is involved and Welwyn Hatfield Borough Council conditions are all handled as part of the job. You get the inspection sign-offs and certificates at the end, which is exactly what a solicitor asks for when you sell.
Building work across Welwyn Garden City
Welwyn Garden City is roughly forty minutes from Bishop’s Stortford, so AL7 and AL8 work is booked in continuous blocks rather than odd days. Small structural jobs run one to two weeks, a single-storey extension eight to twelve, and a full refurbishment two to four months.