How we set out a Chigwell tiling job
Setting out happens before a single tile is fixed. We dry-lay the first run, find the centre line of the room and the sight line from the door, and move the datum so you are not left with a 12mm slither next to the shower screen. Full tiles land where the eye goes, cuts go into corners and under units. It takes an hour and it is the difference between a tiled room and a professionally tiled room.
Substrate first, tiles second
Nothing gets tiled onto a surface we have not checked. Timber floors in Chigwell are overboarded and screwed at 300mm centres, or matted with a decoupling membrane so seasonal movement never reaches the grout. Shower walls get cement board or two coats of tanking slurry with taped internal corners. Plaster that is dusty is sealed. Walls more than 4mm out are levelled before tiling rather than packed out with adhesive.
Large-format and book-matched marble effect
We tile a lot of 600x1200 and 800x1600 porcelain. Those need a levelling-clip system, back-buttering, solid bed coverage and the right notch, otherwise you get lipping and hollow spots that crack the day someone drops a bottle. Book-matched marble-effect panels are dry-laid and photographed first so the veining runs the way you expect across the wall.
Grout, silicone and the details
Colour-matched flexible grout, movement joints where the tiling meets a different material, and silicone rather than grout in every internal corner. Edges are finished with a metal trim or a mitred cut, not a plastic strip stuck on at the end. Everything is sponged, buffed and sealed if the material needs it.
Booked as a continuous run in Chigwell
Chigwell is inside our normal working radius from Bishop's Stortford, so we book Chigwell and the Chigwell and the IG7 area villages tiling as consecutive days with the materials delivered up front. No travel charge, no half days, and the same face every morning until the job is finished and cleaned.