Preparation is the job
A tiler is only as good as the surface underneath. In Hitchin houses that usually means overboarding a springy timber floor, self-levelling a screed that has dipped, or flattening a wall that is 15mm out over two metres before anything is set out. We price preparation openly rather than tiling over a problem and blaming the building later.
SG4 and SG5 substrates
Hitchin runs from Georgian townhouses around Bancroft and Tilehouse Street, through Victorian terraces off Nightingale Road and Walsworth, to interwar semis and later estates on the edges. Older SG4 and SG5 property has solid walls, lime plaster and original timber floors, all of which change the boarding, fixings and levelling before anything is fixed down. That decides the boarding, adhesive class and whether a decoupling layer is needed, and it goes in the quote as a visible line.
Large format and natural stone
Tiles over 600x1200 need full back-buttering, a flat bed and laser-checked levels or every lip shows in raking light. Marble and light stone are sealed before grouting and fixed in white adhesive so nothing bleeds through.
Wet rooms and tanking
Wet areas get cement or foam board, two-coat tanking with taped joints and reinforced corners, formed falls and a linear drain. Tanking is never skipped to hit a price.
Tiling across Hitchin
Hitchin is about eighteen miles from our base, so jobs are booked as continuous days — set out, fix, grout, silicone — rather than trailing over three weeks.