How a Ware bathroom refit actually runs
One team, one job, start to finish. Day one is protection and strip-out — floors covered, suite out, tiles off, skip on the drive or a permit arranged if there is no off-street parking. Days two and three are first fix: pipework rerouted, wastes reset to fall, noggins doubled behind the basin, rail, WC frame and any future grab rail. Then boarding and tanking, tiling, second fix, silicone, and a snagging walk-round with you before the final payment. Most Ware bathrooms are done in 8 to 12 working days and you are never left wondering who is turning up tomorrow.
Hard water is the reason Ware bathrooms fail early
SG12 draws some of the hardest water in the country, and it decides the specification here more than anything else. Sealed-cartridge mixers scale up and get thrown away; we fit brassware with serviceable cartridges, aerators that come apart, and glass treated at installation. A scale reducer on the incoming main is quoted as a separate line and on a Ware bathroom it typically pays for itself twice over the life of the room. The tanking build-up behind it is the usual one: cement board, taped corners, membrane over the tray lip.
Floors, falls and level access
Timber floors get overboarded and stiffened before tiling, because a floor that flexes cracks grout no matter how good the tiler is. Wet rooms get a recessed former between the joists so the finished floor is genuinely level with the landing, with the fall formed into the former rather than built up in adhesive, and a linear drain positioned so the shower screen sits on a flat line.
Riverside and New Road properties, and the state of the pipework
Behind the tiles in the older streets off New Road and down towards the river we still find lead tails, half-inch imperial copper and dead push-fit joints buried in walls. Those get cut out and replaced back to a sound connection rather than adapted, with new isolation valves fitted where you can actually reach them. It is photographed and priced before we touch it, so the extra shows up as an agreed line and not a surprise on the final invoice.